Make sure open purchase orders from previous months still show up in your Retail ORBIT export, even after their due dates have passed.

 

What this does

By default, RICS only counts an open PO as on order while it falls inside the current window. Once a PO's due date passes, it can drop out of the On-Order data RICS sends to Retail ORBIT, even though the goods haven't arrived yet. That makes your on-order numbers, and the plans built on them, look lower than they really are.

Two Open-to-Buy settings in RICS fix this. One changes which date RICS uses to decide whether a PO is still open; the other tells RICS how far back to look.

Before you start

  • These settings must be changed at the organization level, not on an individual store.
  • You'll need a RICS login with access to Setup.

Where to find it

In RICS, go to Setup → Manage Store → Setup Settings → Open-to-buy Options.

RICS2.jpg

Step by step

01 Open Setup Settings. In RICS, go to Setup → Manage Store → Setup Settings.
02 Switch to your organization. In the top right, use the Organization Lookup to select your organization-level settings. Don't pick an individual store.
03 Go to Open-to-buy Options in the organization-level settings.
04 Adjust the two settings below, then save your changes.

The settings

Setting What it does
Use Cancel On to date open On-Order When turned on, the export uses each PO's cancel date instead of its ship date to decide whether it's still open. A PO stays on order until its cancel date, not just until it was due to ship.
Override days for 1st Month open On-Order Sets how many days back the export looks for open POs, so older orders are included. Enter a number of days (see how to calculate it below).
RICS3.jpg
RICS4.jpg

Calculating the override days

Add up the days in the previous month(s) you want to include, plus the number of days into the current month on the day you run the export.

Days in previous month(s) + days into current month = override days
Exporting on You want to include Calculation Enter
March 15 All of February through March 15 28 + 15 43 (44 in a leap year)
April 10 All of February and March through April 10 28 + 31 + 10 69 (70 in a leap year)
Tip: The number depends on the day you run the export, so if your on-order totals look short later in the month, check whether the override days still reach back far enough.

Need help?

If you have questions or run into issues, contact your M1 Advisor or Retail ORBIT Support.

© ManagementONE® · Retail ORBIT® Powered by Management One

Was this article helpful?

0 out of 0 found this helpful

Have more questions? Submit a request

Comments

0 comments

Please sign in to leave a comment.